DETAILS OF NEEDS

ENSURING A SAFE PLACE  
 
Sanctuary Roof Repair
$
148,000
Masonry: Re-pointing and Window Lintel Replacement 
$
105,000
Install Fire/Smoke Alarm System Throughout Building
$
48,000
Remove Asbestos from Basement  
$
26,250
Electrical Upgrade for Air-Conditioning  
$
15,500
Repair Two Pairs of Bronze Doors and Install Emergency Hardware
$
12,000
Replace Oil Tank with Double Hull 
$
11,500
Repair Stone Fence around Building  
$
8,500
Install Handicapped Ramp or Lift at Sanctuary
$
7,000
Repair Skylight in Fellowship Hall
$
4,000
Provide Additional Exterior Lighting at Sanctuary  
$
3,800
Remove Trees at Sanctuary that are Damaging Building  
$
3,500
Repair Wood Door at Sanctuary Entry 
$
3,200
Replace Lost Window Handles (20 locations)  
$
3,000
Refurbish Bluestone Steps at Lancaster Entry
$
2,800
Repair Hardware on Sanctuary Stained Glass Windows
$
2,000
Subtotal  
$
404,050
 
 
ENSURING A COMFORTABLE, WELCOMING PLACE
 
Sanctuary Air-Conditioning
$
67,000
Repair and Refinish Sanctuary Pews 
$
60,000
Air-condition Chapel and Wistar Morris Room
$
35,000
Upgrade Kitchen
$
20,000
Create Storage Area for Tables/Chairs in Fellowship Hall 
$
10,000
City Avenue Vestibule: repair ceiling, clean floor, increase lighting 
$
9,000
Public Address System for Chapel and Fellowship Hall
$
8,000
Create New Directional Signage outside and inside
$
5,000
Provide Walkway from Chapel Entrance to Sanctuary
$
4,500
Replace Pew Cushions
$
  3,000
Subtotal
$
221,500
 
 
ENSURING A PLACE TO WORSHIP
 
Organ Restoration
$
120,000
Renovate Chapel: replace rug (or remove/repair wood floors)
$
53,160
Upgrade Sanctuary Lighting 
$
15,000
Paint Sanctuary Interior Including Stained Woodwork
$
15,000
Repair and Refinish Wood in Sanctuary, lectern, pulpit, chancel walls
$
10,000
Upgrade Sanctuary Sound System for better quality recording
$
8,000
Subtotal 
$
221,160
 
ENSURING THE PLAN’S QUALITY
 
Architectural/Engineering fees  
$
60,000
Fundraising Counsel
$
23,700
Administrative Assistant, printed materials, etc.
$
10,000
Contingency reserve
$
59,590
Subtotal  
$
153,290
 
Faith in the Future Phase 2 TOTAL 
$
1,000,000